retail

DFO Southwharf

Stage One

This design and construct base-build project commenced in October 2012. The project involved the reconfiguration of the mall allowing an increase in traffic flow and an increase in new tenancies. Throughout the project, FOURSQ remained flexible to the CFSGAM’s requirements, accommodating an increase in the scope of works to include polished floors, high bay lighting and shop fronts. 

Our works involved altering the existing mall pathway which introduced a number of additional tenancies to the project’s scope. FOURSQ also assisted in identifying areas to reduce costs and solve design issues as the project progressed. We did so without any sacrifice to quality of end result or timing. FOURSQ was subsequently awarded the next stage of the DFO Southwharf redevelopment.

Find out more about DFO Southwharf Stage Two

ENQUIRIES

For enquiries please contact

FOURSQ 03 9646 4011 Email info@foursq.com.au